Remote Sensing Software User Experience Survey
*
1.
Educational Background
(Required.)
High School
Bachelor's Degree
Master's Degree
Doctorate
Other (please specify)
*
2.
Level of Experience in Remote Sensing Software
(Required.)
novice (Limited or no experience)
intermediate (Some experience)
expert (Proficient user)
3.
Level of Experience in Each Software (from None to Expert):
None
Novice
Intermediate
Expert
SNAP
None
Novice
Intermediate
Expert
ERDAS Imagine
None
Novice
Intermediate
Expert
Envi SARSCAPE
None
Novice
Intermediate
Expert
*
4.
Familiarity with SAR Data:
(Required.)
Not familiar
Somewhat familiar
Very familiar
*
5.
Previous Use of the Software for SAR Data Processing
(Required.)
Yes, for SNAP
Yes, for ERDAS Imagine
Yes, for Envi SARSCAPE
No, I haven't used any of these for SAR data processing
6.
How would you rate the overall intuitiveness of the user interface in the following softwares?
(1) Very Difficult
2
3
4
(5)Very Intuitive
N/A
SNAP
(1) Very Difficult
2
3
4
(5)Very Intuitive
N/A
ERDAS Imagine
(1) Very Difficult
2
3
4
(5)Very Intuitive
N/A
Envi SARSCAPE
(1) Very Difficult
2
3
4
(5)Very Intuitive
N/A
7.
How would you rate the consistency in layout and design elements across different functionalities in the software?
(1) Very Inconsistent
2
3
4
(5) Very Consistent
N/A
SNAP
(1) Very Inconsistent
2
3
4
(5) Very Consistent
N/A
ERDAS Imagine
(1) Very Inconsistent
2
3
4
(5) Very Consistent
N/A
Envi SARSCAPE
(1) Very Inconsistent
2
3
4
(5) Very Consistent
N/A
8.
How long did it take you to become comfortable using
basic
functions (such as Importing and exporting data, Digital Elevation Model (DEM) generation, Filtering and calibrating data) in each software?
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
SNAP
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
ERDAS Imagine
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
Envi SARSCAPE
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
9.
How long did it take you to become comfortable using
application oriented
functions (such as interferometer generation, land cover classification, Change detection analysis, Phase unwrapping ) in each software
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
SNAP
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
ERDAS Imagine
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
Envi SARSCAPE
less than a week
1-2 weeks
2-4 weeks
more than a month
don't apply
Current Progress,
0 of 9 answered